[vc_row][vc_column][cspt-single-image image=”379″][/vc_column][/vc_row][vc_row][vc_column][vc_empty_space][vc_custom_heading text=”ARC FLASH AUDIT” font_container=”tag:h2|text_align:center”][vc_empty_space][/vc_column][/vc_row][vc_row][vc_column width=”1/4″][cspt-single-image image=”392″][/vc_column][vc_column width=”3/4″][vc_column_text]
When any short circuit happens in an electrical network between two live conductors either by direct contact or indirect contact, it will leads to the huge fault in the electric network. This fault will generate an electric arc which in turn leads to a flash which is generally known as electric arc flash in the industries.
We offer this Arc Flash Analysis in compliance with OSHA, NFPA 70E 2021, IEEE 1584 and NEC Latest standards as applicable.
Another effective way to help prevent arc flashes is to use the 4P Model for arc flash hazard management: Predict, Prevent, Protect, Publish.
[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_empty_space][vc_empty_space][vc_custom_heading text=”ARC FLASH WARNING LABELS” font_container=”tag:h2|text_align:center”][vc_empty_space][/vc_column][/vc_row][vc_row][vc_column width=”1/4″][cspt-single-image image=”381″][/vc_column][vc_column width=”3/4″][vc_column_text]
In compliance with NFPA 70E, energized equipment should be installed with warning labels, such as arc flash stickers (also known as electrical hazard labels). These warning labels inform workers about the potential of electrical explosion or high voltages.
The 2017 edition of NFPA 70®: National Electrical Code states in Article 110.16: “Electrical system, such as switchboards, switchgear, panel boards, industrial control panels, meter socket enclosures, and motor control centers that is in other than dwelling, and is likely to require examination, adjustment, servicing, or maintenance while energized, shall be field or factory marked to warn qualified persons of potential electric arc flash hazards…The marking shall be located so as to be clearly visible to qualified persons before examination, adjustment, servicing, or maintenance of the equipment.”